  1. Good news on Nuscale’s design certification process getting underway. So the 40 month process (+/- a few) gets started now, but the COL for the first installation site won’t start until 2018? The COL approval process for several of the large reactors has been even longer than the design certification. Is there any reason to believe that the COL process for UAMPS or any other SMR site will be faster? I can easily see a situation where the design gets certified but NuScale is stuck in a holding pattern for several years waiting for site and construction approval? Am I wrong to worry about such a thing happening?

  2. @Tim Wyant

    There is always the possibility that licensing reviews can be delayed. UAMPS has a reasonable chance of taking less time than some of the other COLs because it has selected a site where there should be less local opposition and interference.

    Also, some of the COL delays for projects like Vogtle and Summer were caused by delays in approving design certification amendments.

  3. “There is always the possibility that licensing reviews can be delayed.”

    Not with a little outside the box creative management and a ‘Sroke of the Pen’ decision by Sec of Energy. INL is a DOE site, with much of the same Mission (and oversight) on nuclear as NRC. If the NRC certifies the NuScale design as safe, DOE should tell NRC to MYOB on what we do with OUR site. INL has managed to develop, build, and operate 52 reactors in its history… how many had an NRC COL? DOE has already ‘bought in’ to the NuScale concept by granting them ~$252M development funds.

    From INL’s web page:
    “What is INL?

    INL is part of the U.S. Department of Energy’s complex of national laboratories. The laboratory performs work in each of the strategic goal areas of DOE: energy, national security, science and environment. INL is the nation’s leading center for nuclear energy research and development.”

    INL is a ‘natural’ choice for over sight to see this project to fruition… let a turf battle be solved by ‘whomever’ solves turf battles between departments in the US Government… with the stroke of a pen.

    If NRC certifies the NuScale design as safe, I really don’t see a need for a COL (even legal) and the best plan is to get this thing built and running totally under DOE, on security proofed DOE property!

    Rick Perry are you listening?

Comments are closed.

Similar Posts

  • X-Energy introduced its company and first product to Virginia chapter of ANS

    On Tuesday, October 27, three leaders from X-Energy spoke to the Virginia ANS chapter about their company and the Xe-100, the high temperature, pebble bed gas reactor power system that they are designing. During the presentation, meeting attendees learned that X-Energy is an early phase start-up with a total staff of a few dozen people,…

  • Atomic Show #156 – ANS Annual Meeting, Platts SMR, NRC’s shrinking budget

    Lisa Stiles and Rod Adams met for a chat about recent nuclear industry meetings including the American Nuclear Society annual meeting that Lisa attended in San Diego in early June and the Platts – DOE Small Modular Reactor meetings that Rod attended in Washington, DC in late June. After signing off with Lisa, Rod asked…

  • Atomic Show #331 – Caleb Brooks, Kronos MMR Project lead for University of Illinois

    The University of Illinois-Urbana Champagne (UIUC) is planning to build a uniquely capable micro reactor project on its campus. For decades, the university hosted a traditional research reactor that supported important research projects and provided operating experience. But, like the majority of university research reactors, it did not produce any useful heat or electricity. Kronos…

  • House Energy and Commerce seeks to enable advanced nuclear energy

    On Friday, April 29, 2016, the Energy and Power subcommittee of the House Energy and Commerce Committee held a hearing to discuss H.R. 4979 and a draft discussion bill with the unfortunate acronym of NUKEPA (Nuclear Utilization of Keynote Energy Policies Act). Though at different stages of the legislative process, both documents are efforts to…

  • Atomic Show #233 – Innovators discuss advanced reactor development in US

    There are a growing number of innovative small companies and a few divisions of larger companies that have recognized that nuclear energy offers solutions to a number of important human challenges. Despite the proclamations by opponents, the Nuclear Renaissance is not any more dead in 2015 than the original Renaissance was dead in 1315. In…

  • The Atomic Show #057 – Boiling Water Reactors

    Shane and Rod discuss boiling water reactors, one of the two types of established light water reactors. There are two main types of light water reactors, pressurized water reactors (PWR) and boiling water reactors (BWR). They share some characteristics, but also have a number of differences. There are plenty of sources of information on the…