Similar Posts

  • Atomic Show #343 – Yasir Arafat, CTO Aalo Atomics

    Aalo Atomics is a three year old company that is focused on designing, manufacturing and deploying nuclear reactors. Their stated goal is to achieve an electricity production cost of less than $0.03 (3 cents) per kilowatt hour. It’s moving fast. It built a 40,000 ft² pilot scale manufacturing plant in Austin, TX in just one…

  • DOE and UAMPS sign agreement for siting at INL

    At the 12th annual Platts Nuclear Energy Conference, John Kotek, the Acting Assistant Secretary of Energy for Nuclear Energy just made a major announcement. Yesterday, February 17, 2016 Rick Provencher and Doug Hunter signed an agreement between the U.S. Department of Energy and UAMPS (Utah Associated Municipal Power Systems). It provides UAMPS with a use…

  • X-300 Blazing a Different Kind of Trail in Smaller Nuclear Reactor Development

    GEH spent about half a billion dollars designing, testing and certifying the ESBWR. Despite that investment, the 1,520 MWe Enhanced, Simplified Boiling Water Reactor (ESBWR) design documents are just gathering dust with no active projects in sight. GEH is a joint venture between US-based GE, a $95 billion annual revenue conglomerate and Hitachi, a Japanese…

  • McMurdo Station – the New York of the Deep Freeze South

    (Note: If you are impatient and do not want to watch cute photos of penguins, skip to 19:06 to learn more about the reasons why the PM-3A, a 1,500 kilowatt nuclear electricity generator and process heat supply system, was such a valuable contributor to sustained Antarctic research.) Nearly all of the images that are used…