7 Comments

  1. $3 bn for 2 GWe of highly reliable electric generating capacity these days is a pretty good deal, especially if the plant can be made ready at a fixed price on a date certain. If I remember correctly, Duke’s $3 bn into an 630 MWe IGCC facility right over the border in Indiana that isn’t even operating yet…

  2. The City of Gary Indiana could post a Tax Free Municipal bond for an investor in this plant. Gary needs cheap abundant electricity to help revive its steel industry.

Comments are closed.

Similar Posts

  • FPL seeking PSC "determination of need"

    As Atomic Insights readers may remember, I have a lifelong association with FPL (Florida Power and Light). My Dad worked as an engineer for the company for 35 years – starting well before I was born. Dad passed away just one month after he retired, so it is almost completely accurate to say that the…

  • My Answer to Heritage Blog Question – But What about the Waste?

    Heritage Foundation blogger Nick Loris produced a blog entry dated August 5, 2008 and titled Nuclear Energy’s Great, But What about the Waste? that includes several passages that might have been influenced by the same thinking that has resulted in my used nuclear fuel strategy. For example, Nick wrote: Let’s start with some basics. What…

  • Nuclear referendum in the market

    BNFL has announced that they are going to sell their Westinghouse division. This sale is going to be an interesting case to watch, as it will either validate my position about the bright future for nuclear power or disprove it. Though there are a lot of legacy products with the Westinghouse brand on them, the…

  • Is T. Boone Pickens Holding a Nuclear Hole Card?

    T. Boone Pickens is making a lot of waves in the energy world – again. He has 60 years worth of history in the business as a wildcat driller, corporate raider and hedge fund manager who is proud of the fact that he has paid more than half of the taxes that he has ever…